Skip to main content

Types of Waste (Muda)

Lean identifies the following types of waste that reduce efficiency:

  1. Overproduction
  2. Unnecessary motion
  3. Waiting
  4. Excess inventory
  5. Defects
  6. Unnecessary transportation
  7. Unnecessary storage
  8. Underutilized employee potential

The goal of Lean is to eliminate these wastes, leading to improved quality and reduced costs.

 

  1. Leksic, I., Stefanic, N., & Veza, I. (2020). The impact of using different lean manufacturing tools on waste reduction. Advances in production engineering & management, 15(1).
  2. Rahmanasari, D., Sutopo, W., & Rohani, J. M. (2021, March). Implementation of lean manufacturing process to reduce waste: a case study. In IOP Conference Series: Materials Science and Engineering (Vol. 1096, No. 1, p. 012006). IOP Publishing.
  3. Paramawardhani, H., & Amar, K. (2020). Waste Identification in Production Process Using Lean Manufacturing: A Case Study. Journal of Industrial Engineering and Halal Industries, 1(1), 39–46. https://doi.org/10.14421/jiehis.1827