Types of Waste (Muda)
Lean identifies the following types of waste that reduce efficiency:
- Overproduction
- Unnecessary motion
- Waiting
- Excess inventory
- Defects
- Unnecessary transportation
- Unnecessary storage
- Underutilized employee potential
The goal of Lean is to eliminate these wastes, leading to improved quality and reduced costs.
- Leksic, I., Stefanic, N., & Veza, I. (2020). The impact of using different lean manufacturing tools on waste reduction. Advances in production engineering & management, 15(1).
- Rahmanasari, D., Sutopo, W., & Rohani, J. M. (2021, March). Implementation of lean manufacturing process to reduce waste: a case study. In IOP Conference Series: Materials Science and Engineering (Vol. 1096, No. 1, p. 012006). IOP Publishing.
- Paramawardhani, H., & Amar, K. (2020). Waste Identification in Production Process Using Lean Manufacturing: A Case Study. Journal of Industrial Engineering and Halal Industries, 1(1), 39–46. https://doi.org/10.14421/jiehis.1827